Jack Freeman
Here are some of our 1st production parts using our new Vectis Cobot. These are turning out very nice. Is there any way to speed up the arm's movement in between welds?:

https://youtu.be/WZsp-pzzcCg

We are going to do a time study on this part: A welder building 150 pieces vs. a welder and the Cobot building 150 pieces. I will post the results in a week or so.
Reply 1 0
Kyle Anderson
Hi Jack,

There's another thread on that here:   https://vectisautomation.com/community-forum?p=post%2Fspeed-optimization-11862366%3Fpid%3D1327465016

But here's the brief summary:

We often get asked "how do I speed up my program" and here are some tips and tricks to help everyone out. 

The “reduced” status on the bottom left of the pendant is as designed, there isn’t a “normal” or “full” speed, but you will see that status update based on the current condition of the system (such as “freedrive” or “power off”).  Due to the collaborative nature of the system, the cobot’s max speed is limited to 250 mm/s or 590 ipm (~20-50x typical weld speeds).

A few tips to optimize cycle time:

  1. Make sure your speed slider at the bottom of the pendant is set to 100%. FYI – this speed slider only affects non-process moves.  In other words, the speed slider affects “AirMoves,” but not weld speeds.
  2. Use AirMoveLs instead of AirMoveJs for faster movement
    • AirMoveLs might not look as smooth as AirMoveJs, but adding a blend radius will also help that…
    • When using MoveL's avoid large reorientations. It may take several MoveL's to unwind an axis completely. The cobot may get 'wound up' if not using enough airmoves to manage the weld bundle.
  3. Add a “Blend Radius” to your AirMoves (either Js or Ls)
    • If there is no blend radius, the cobot will physically stop at the programmed AirMove
    • With a blend radius, the cobot will not stop at the programmed AirMove, and will shortcut the point based on the selected size of the blend radius
    • Make sure to check your program at 100% speed by playing through it instead of just stepping to your AirMoves because the blend radius will only take affect when playing through the programmed point.  You might otherwise find a collision that didn’t exist when you’re avoiding the blend radius.
Reply 0 0
Jack Freeman
Thank you Kyle, we did find that the L moves were more likely to cause a "wind up" with the torch so I believe we have been exclusively using J moves... that may be slowing us down a bit.

For anyone interested, we did a time study on the part in the above video yesterday. The program was completed and refined prior to running the test. It runs very reliably with very little interruption. 

Test #1 (Manual Welding of parts by welding tech.): 50 pieces completed in 4 hrs. 3 minutes averaging 4.9 minutes per part.

Test #2 (Manual tacking/fixturing, Cobot welding the above part. Plus, the welding tech. would manually weld the assembly as he had time): 50 pieces completed in 4 hrs. 30 minutes averaging 5.4 minutes per part.

Conclusion: We were a bit surprised to see that the project utilizing the Cobot was slower:
1. Quality is superior with the Cobot.
2. We can reduce "Arc off" time by setting a timer for the welding tech. to know when the program is done.
3. We can virtually eliminate "Arc off" time by running an "A" and a "B" table so long as the welding tech. can fixture parts without risk of getting flashed.
4. This is the welding tech's 1st time interacting with automation and I am sure there was some extra caution (which is good).

Let me know you thoughts. We will be running production on it for about a month and then try another time study to gauge improvement.



Reply 0 0
Josh Pawley
Hey Jack, thanks for providing the additional info & context.  Here are some initial thoughts:

I was surprised to see the faster manual cycle time average.  In general, we're seeing most customers get in the 2x-3x productivity boost realm (i.e. cobot cycle time should be down around 1.75-2.5min), and even sometimes in the 5x+ realm.  Here are some ideas/thoughts to boost the gains:
  • What weld parameters are you running?  Mainly looking to know travel speed, voltage/trim, and WFS.  Depending on where you're at now, you may be able to run hotter (higher WFS, higher voltage/trim) and thus faster.
  • What material thickness are those parts, and what weld size are you looking for?  This can help us make some suggestions on the parameter tweaks
  • You are spot-on with your 3rd bullet note - going to a "dual-zone" method of operation should significantly boost productivity, as the overall utilization "money-making blue-light time" is much higher.  Attached are a few examples of multi-zone setups - you can hang more fixtures of the cart, butt-up a second cart, etc.  Happy to consult/collaborate on multi-zone fixture ideas if you'd like.
  • I'm curious on the manual cycle time - did the welder know he/she was being timed; and/or was it your best welder?  We have seen before where the "stopwatch effect" creates inaccurate manual benchmarks, as they don't take into account the usual aspects of productivity.  I've seen some pretty significant differences between manual productivity on a stopwatch vs. manual productivity sampled at random and averaged across welders.  May be something to look into.
  • To your 4th bullet point - yes, we typically see improvements over time as the Cobot Champion makes the air moves more efficient, pushes the limit on weld parameters, figures out the most efficient way to load/unload, etc.
  • If you send us a video of the full program cycle, we may be able to spot some areas where cycle time can be reduced - extraneous air moves, for example.  Let us know if this is interesting and we can send you a dropbox link to place a video in (or feel free to send another YouTube video clip).
Thanks again for the dialogue Jack, looking forward to seeing the next phase of results!
Reply 0 0
Jack Freeman
Thanks Josh,
I will work on providing you weld parameters and a full program cycle video for these parts (10ga.)

Here is our A B setup. We have not modified the program to utilize the 2nd table for production yet:

PXL_20220121_213141677.jpg 
Reply 0 0
Josh Pawley
Looks great Jack!  I imagine the dual-zone setup will help boost productivity.

Looking forward to reviewing the parameters & full-cycle video, and collaborating on that front.  We have been able to get pretty aggressive on travel speed with a 3/16" fillet on 1/8-3/16" thickness tight-fitting parts.

Have a nice weekend!
Josh
Reply 0 0
Jack Freeman
Josh,
Dual zone setup did indeed cut the time down by more than half! We went from 5.4 mins/part to 2.2 mins/part by having the operator re-fixture the A table while the B table was running:
PXL_20220209_191535339_2.jpg 

Has anyone made or found a solution to allow the operator to work close to the arc without full welding shade? It is challenging to fixture the B table when your helmet is going dark. Here is our best solutions so far...tunnel vision shield!
PXL_20220209_191605006.jpg 
Reply 0 0
GrahamWilliams
Hello @Jack Freeman, glad to see continuing productivity improvements!

We have seen customers add in a sheet metal divider between zones. This can restrict access immediately near the divider so some revision to fixture locations and air moves may need to occur.

When a barrier is added, the home/safe position at the beginning and end of each program is centered above the divider so that the robot can jump into either zone in whichever order. Please see the picture below that is meant to highlight a similar barrier another customer created. Also, should you choose to move forward with a barrier, I do recommend painting in a non-reflective darker paint (or leave as steel with heavier mill scale).
       Center Barrier Highlighted.png
Please let us know if this helps out and feel free to post or call with any additional questions.  
-Graham